Turn your rough scope notes and numbers into a polished, client-ready bid proposal that helps you win the job.

What you get: A complete, professional bid proposal in Markdown, ready to paste into Word or Google Docs and export to PDF. It includes a cover block, intro letter, project summary, detailed scope with inclusions and exclusions, a pricing table with checked math, optional add-ons, schedule, payment terms, warrant Price: $69 flat. Time: usually ready in minutes. Done by AI; you review it, with one free change.

We're not taking orders yet. Join the waitlist and we'll email you once when we open.

Real example

This is an actual result our AI made in a test run, from sample details. Yours is made from your details.

Show the example

Bid Proposal: Lin Hall Bathroom Remodel

For Dave: The proposal starts below and is ready to paste into Word or Google Docs. Fill in the [bracketed placeholders] before sending. Please read "Notes for you" at the end first. The line items add up to $100 more than the total you gave me.


Ridgeline Remodeling LLC

Kitchen & Bath Remodeling

Dave Ortiz, Owner (555) 214-8890 dave@ridgelineremodel.com Licensed Contractor #CR-44821 · Fully insured


Proposal for Sarah & Tom Lin Job address: 418 Maple Ct, Springfield Proposal #: [Proposal #] Date: [Proposal date] Valid until: [Proposal date + 30 days]


Dear Sarah and Tom,

Thank you for the chance to bid on your hall bathroom remodel. You want to replace the old tub/shower combo with a walk-in shower that's safe and easy to step into with a toddler in the house, along with a new vanity and a new tile floor. Sarah, you also mentioned two concerns: dust, and how long you'll be without this bathroom.

This plan is built around those points. Before any demolition, we'll cover the floors with ram board and put up a dust barrier at the hallway to keep dust in the work area. The shower uses a low-curb pan with Schluter waterproofing, a Moen Posi-Temp pressure-balancing valve, and a 2x2 mosaic shower floor. We expect to be on site for about 12–14 working days. The schedule below shows the order of work so you'll know what's happening each step of the way.

Everything that's included, excluded, and priced is spelled out here, so there are no surprises. If anything is unclear, call or email me anytime.

Warm regards,

Dave Ortiz Owner, Ridgeline Remodeling LLC


Project Summary

We will remove the existing tub/shower combo, wall tile, floor tile, vanity, and toilet from your roughly 9 x 7 ft hall bathroom. In their place we will build a low-curb walk-in shower with porcelain tile to the ceiling, a recessed niche, a new valve, and a frameless glass door. We'll also install your new 36" vanity and faucet, lay a new porcelain tile floor, reinstall the toilet, and paint the walls and ceiling. Floors and the hallway are protected and dust is contained throughout the project.

At a glance

Project Hall bathroom remodel: tub-to-walk-in-shower conversion, new vanity, new tile floor
Location 418 Maple Ct, Springfield
Estimated duration About 12–14 working days on site
Investment (base total) $16,350.00

Scope of Work

Phase 1: Protection & Demolition

  1. Protect floors and the hallway path with ram board.
  2. Install a dust barrier to contain dust in the work area.
  3. Remove the existing tub, wall tile, floor tile, vanity, and toilet.
  4. Haul away and dispose of all demolition debris.

Phase 2: Subfloor Inspection

  1. Inspect the subfloor once the old flooring is removed.
  2. Make minor subfloor repairs as needed, up to one (1) sheet of plywood (included in price).

Phase 3: Plumbing

  1. Relocate the drain for the new walk-in shower.
  2. Install a new Moen Posi-Temp shower valve (rough-in and finish).
  3. Reinstall the toilet after the new floor is complete.

Phase 4: Shower Pan & Waterproofing

  1. Install a low-curb shower pan.
  2. Waterproof the shower area with a Schluter waterproofing system.

Phase 5: Tile

  1. Install 12x24 porcelain tile on the shower walls, floor to ceiling.
  2. Build and tile one (1) recessed niche in the shower.
  3. Install 2x2 mosaic tile on the shower floor.
  4. Install 12x24 porcelain tile on the bathroom floor.

Phase 6: Fixtures & Glass

  1. Install the client-supplied 36" vanity and faucet.
  2. Install a frameless glass shower door (see allowance below).

Phase 7: Paint

  1. Paint the bathroom walls and ceiling.

Materials & Selections

Included / specified

Item Specification
Shower valve Moen Posi-Temp
Shower pan Low-curb shower pan
Waterproofing Schluter waterproofing system
Floor repair material Up to 1 sheet of plywood

Allowances

An allowance is a budget amount included in your price for items you'll pick out. If your final selection costs more than the allowance, the difference is added to your contract by change order. If it costs less, the difference is credited back to you. Allowances are adjusted to actual cost.

Allowance Amount Notes
Tile & setting materials $2,400.00 Covers shower wall tile, shower floor mosaic, bathroom floor tile, and setting materials. Sales tax is included in this allowance.
Frameless glass shower door $1,400.00 Covers the frameless glass door.

Client-supplied items

Item Responsibility
36" vanity Client purchases; Ridgeline installs
Vanity faucet Client purchases; Ridgeline installs

Please have client-supplied items delivered to the home by [vanity/faucet delivery date].

Selections we'll need from you

Selection Needed by
Shower wall tile (12x24 porcelain) [Selection deadline]
Shower floor tile (2x2 mosaic) [Selection deadline]
Bathroom floor tile (12x24 porcelain) [Selection deadline]
Grout color(s) [Selection deadline]
Niche size and location [Selection deadline]
Glass door style and hardware finish [Selection deadline]
Paint color(s) for walls and ceiling [Selection deadline]

Timely selections help keep the project on schedule.


Not Included (Exclusions)

The following are not included in this proposal:

  • Electrical work beyond swapping the existing light fixture and fan
  • Mold or water damage remediation
  • Permit fees. Ridgeline will pull the permit; the permit fee is paid by the client.
  • Moving walls
  • Subfloor repairs beyond one (1) sheet of plywood
  • Purchase of the vanity and faucet (client-supplied; installation is included)
  • Optional add-ons listed below, unless

Questions

How does the job bid proposal writer work?

You answer a few questions, pay $69, and an AI worker does the job. The result appears on your private page, usually within minutes.

Can I get changes?

Yes. Every job includes one free change request: tell the donkey what to fix and it redoes the job with your notes.

Is it really done by AI?

Yes, fully. No human writes it. AI can make mistakes, so please review the result before you rely on it.

What happens to my information?

It is used only to do your job, is never used to train AI models, and is deleted after 30 days.

What if it fails?

Failed jobs are retried once, then refunded automatically.

Is this professional advice?

No. This is general information and drafting help made by AI. For medical, legal, tax, or financial decisions, talk to a qualified professional.

Need something different?

Can't find it? Describe anything.

Our AI checks it's something we can do safely, then shows you exactly what you'll get and a flat price. Nothing is charged until you order.

More in Sales